• Subscriptions
  • Advertise
  • Contact Us
  • Careers

Logo

Navigation
  • Home
  • Cover Features
  • Departments
    • Flashback
    • In the Spotlight
    • New to the Community
    • Making Moves
    • Profiles
    • Talking Shop
    • The Last Word
    • Women in Business
    • Last Word
    • Corporate Anniversary
    • Around Town
  • Opinion
    • Economic Outlook
    • Island Outlook
    • From the Experts
    • Letters to the Editor
  • Signature Events
  • From the Experts

If you could upgrade one infrastructure project on the island, what would it be and why?

on September 9, 2016 | Leave a comment
The Last Word

“I would like to see that trees, plants and bushes along the road — Beach Road initially, but all roads — are pruned, nourished and landscaped all around. This is what a tropical island is all about.”

norman-t-tenorio-2

Norman T. Tenorio

President and CEO of Pacifica Insurance Underwriters Inc. and managing director of J.C. Tenorio Enterprises Inc.

 

“With an increase in residents projected and associated cars on the road, it is imperative that we develop a traffic management system that can move traffic in the most efficient manner. Presently, it appears that some desktop concocted timing system is employed that prioritizes maintaining a 35 mph speed limit on Marine Corps Drive. It obviously doesn’t work. The moment someone pushes a pedestrian crosswalk button, or there is a fender bender (or worse), the entire system chokes and backs up. It is no wonder that Guam drivers run red lights a lot. Sitting at an intersection for five minutes with no cars actually going through it half of the time because timing cycles are off is not only frustrating, it also wastes energy.”

paul-e-r-packbier

Paul E.R. Packbier

President, PCR Environmental Inc.

 

“I would upgrade the electrical power generators and the transmission grid on Guam because stable and reliable electricity is very important to everyone.”

albert-huang

Albert Huang

Owner and dentist, Island Dental

Share this story:
  • tweet

Recent Posts

  • ‘Taste-a-licious’ Slingstone Coffee to be sold

    February 4, 2025 - 0 Comment
  • Carrying a legacy forward

    February 4, 2025 - 0 Comment
  • Ben Ferguson: Happenstance and hard work

    February 4, 2025 - 0 Comment

No Responses to “If you could upgrade one infrastructure project on the island, what would it be and why?”

You must be logged in to post a comment.

  • Popular Posts
  • ‘Taste-a-licious’ Slingstone Coffee to be sold

    February 4, 2025 - 0 Comment
  • The Best Policy

    June 3, 2014 - 0 Comment
  • Full tank: Petroleum industry leaders talk strategies

    June 3, 2014 - 0 Comment
  • 2014 Businesswoman of the Year: The Ingenious Shirley Sablan

    June 3, 2014 - 0 Comment
  • Contact Us
  • Privacy Policy
© 2021. All Rights Reserved. Site by Glimpses of Guam.